This corner is almost ready for the installation of our new display aquarium
Construction of the new counter is well underway
View from the main room, on the left you can see the corridor which leads to the fishroom and on the right the cabinet room
The walls are stripped and ready for repapering in the cabinet room
This is the corridor before work commences
Another 'before' view
Steve building the racking in preparation for the aquariums
Steve clad over the window before beginning the racking to ensure there would be no sunlight in the fishroom.
Phase one in the main shop is complete
The new display aquarium is installed and stocked with Discus
The shelves are stocked
The cabinet room has been redecorated
A selection of some of the cabinets and aquariums for sale
A small selection of the Fluval Aquarium range
The radiator and boiler have been removed and the walls are in the process of being panelled
New wall lamps have been installed
Aquariums are in place and stocked
Still far from complete but great progress has been made
Steve contructed this system to be futureproof. When our new aquariums are delivered the old systems will be phased out bank by bank. So even though it may look a bit odd at the moment, as work progresses it will all fit together perfectly.